SpringHill Suites Houston NW · Type B relicensing · 139 rooms (86 king, 53 queen) · Marriott Panorama Gen 4.5
35
Open · China
$96,792
PARS benchmark
$48,396
China target @50%
$786K
Total quote (all PIP)
Priority hotel. HOUZN PIP due before HOURP. Most Phase 4 items tagged order-now in ClickUp had 2026-02-28 due dates, now ~7 weeks past. Factory lead times for custom upholstery are 12-15 weeks per existing quotes (MTS Seating, Quality & Company Canada). May orders land August.
PARS benchmarks loaded from HOUZN - Marriott FF&E - 250221 quote (pre-PO full quote, $786,648 grand total). Unit costs shown below per PIP item. China target = 50% off PARS unit cost + consolidated freight. Factory quotes at 40%+ below PARS trigger PARS exception filing with Marriott brand.
Reference docs in THM Drive: HOUZN - PIP - 230419.pdf · HOUZN - Marriott FF&E - 250221 (grand total $786,648) · SpringHill Suites Gen 4.5 Panorama Interior Design Specification Manual · houzon lead times.xlsx
Walk-the-showroom script
"SpringHill Suites Houston NW · Type B relicensing · Marriott Panorama Gen 4.5 · 139 rooms."
Hand printed spec and the PARS unit cost. Ask for matching spec + price per unit at real quantity.
MOQ + FOB at qty + lead time + freight-forwarder tie to Houston.
Ask for "Marriott PARS-equivalent spec" quote in writing for the exception filing.
Request photos of completed SHS / Courtyard / Fairfield projects.
WeChat QR, not business card.
Open items for China sourcing 35
🛋️ Foshan Lecong (hospitality FF&E) 5PARS $72,041
PIP #11TO DO2 - Building InteriorLobby Areas
Provide Y shaped sectional with required electrical
PARS benchmark · est. $32,652 · target China @50% = $16,326
Marriott SKU
PARS vendor
Unit
Qty
Est. line
GR-200L
Quality & Co Canada
$16,326
1
$16,326
GR-200R
Quality & Co Canada
$16,326
1
$16,326
PIP #13TO DO2 - Building InteriorLobby Areas
Replace Network Zone banquette
💬 Good condition - ?
PARS benchmark · est. $24,866 · target China @50% = $12,433
Marriott SKU
PARS vendor
Unit
Qty
Est. line
GR-209L banquette 6pc
Quality & Co Canada
$12,433
1
$12,433
GR-209R banquette 6pc
Quality & Co Canada
$12,433
1
$12,433
PIP #30TO DO3 - Food and Beverage AreasBar
Replace bar seating
PARS benchmark · est. $12,594 · target China @50% = $6,297
Marriott SKU
PARS vendor
Unit
Qty
Est. line
GR-203 Luna BS-42.5
Global Source
$334
12
$4,008
GR-204 Format-C/Kelp 30
ISA International
$245
12
$2,940
GR-205 dining sling-SC
Global Source
$269
6
$1,614
GR-213 Rodm-BS 42.5
Global Source
$336
12
$4,032
PIP #12TO DO2 - Building InteriorLobby Areas
Replace upholstered seating
PARS benchmark · est. $1,929 · target China @50% = $964
Marriott SKU
PARS vendor
Unit
Qty
Est. line
GR-201 Jessa wing
Quality & Co Canada
$1,459
varies
GR-202 Hammer arm
Segis USA
$470
varies
PIP #18TO DO2 - Building InteriorLobby Areas
Replace Quick Print task seating
PARS benchmark · est. $0 · target China @50% = $0
Marriott SKU
PARS vendor
Unit
Qty
Est. line
Quick Print task seating
TBD
$0
1
$0
🪑 Foshan Lecong 4PARS $24,751
PIP #14TO DO2 - Building InteriorLobby Areas
Replace tables
💬 Good condition
PARS benchmark · est. $17,876 · target China @50% = $8,938
Marriott SKU
PARS vendor
Unit
Qty
Est. line
GR-208 nesting side
Neil Allen
$498
1
$498
GR-211 nesting coffee quartz
Neil Allen
$987
1
$987
GR-214 communal w/power 84x38
Neil Allen
$3,920
1
$3,920
GR-215 corner side
Neil Allen
$317
1
$317
GR-217L boomerang
Neil Allen
$6,077
1
$6,077
GR-217R boomerang
Neil Allen
$6,077
1
$6,077
PIP #29TO DO3 - Food and Beverage AreasBreakfast Service
Replace tables
PARS benchmark · est. $6,816 · target China @50% = $3,408
Marriott SKU
PARS vendor
Unit
Qty
Est. line
GR-207 table top 24x30
MTS Seating
$159
6
$954
GR-207B base dining
MTS Seating
$104
6
$624
GR-210 table top
MTS Seating
$159
6
$954
GR-210B base bar-ht
MTS Seating
$116
6
$696
GR-216 Weke 36x24
Segis USA
$396
6
$2,376
GR-216B base
Segis USA
$202
6
$1,212
PIP #35REVIEW4 - Recreation FacilitiesFitness Center
Replace towel/trash cabinet
PARS benchmark · est. $59 · target China @50% = $30
Marriott SKU
PARS vendor
Unit
Qty
Est. line
RE-600M bracket
Peerless
$59
1
$59
PIP #39REVIEW4 - Recreation FacilitiesSwimming Pool
Replace towel & trash cabinet
🧱 Foshan or Ningbo 5
PIP #6TO DO2 - Building InteriorLobby Areas
Replace corner guards
PIP #31TO DO4 - Recreation FacilitiesFitness Center
Install full-height, 1-½" wide corner guards to match the color tone of adjacent walls
PIP #47TO DO7 - GuestroomsGuestrooms
Replace corner guards
💬 Most rooms do not already have
PIP #65TO DO7 - GuestroomsGuest Bathroom
Replace corner guards
PIP #68TO DO7 - GuestroomsCorridors and Stairwells
Replace corner guards
🖼️ Foshan/Shenzhen print 11
PIP #5REVIEW1 - Site & Building ExteriorExterior Signage and Graphics/Lighting
Replace all exterior graphics and signage
PIP #24BLOCKED2 - Building InteriorLobby Areas
Replace interior graphics and signage
PIP #33REVIEW4 - Recreation FacilitiesFitness Center
Replace wall graphic (full wall)
PIP #37BLOCKED4 - Recreation FacilitiesFitness Center
Replace Interior Graphics and Signage
PIP #41BLOCKED4 - Recreation FacilitiesSwimming Pool
Replace Interior Graphics and signage
PIP #42BLOCKED6 - Meeting SpacesMeeting Spaces
Replace Interior Graphics and signage
PIP #62BLOCKED7 - GuestroomsGuestrooms
Replace interior graphics and signage
PIP #75BLOCKED7 - GuestroomsCorridors and Stairwells
Replace interior graphics and signage
PIP #79BLOCKED7 - GuestroomsGuest Laundry
Replace interior graphics and signage
PIP #83BLOCKED8 - Back of House Administration Office Area
Replace interior graphics and signage
PIP #84BLOCKED8 - Back of House Employee Break Room
Replace interior graphics and signage
🪵 Foshan (LVT/wood) 2
PIP #32TO DO4 - Recreation FacilitiesFitness Center
Replace flooring and base
PIP #86TO DO12 - Elevators
Replace flooring
🏗️ General Foshan Lecong 5
PIP #3UNKNOWN1 - Site & Building ExteriorLandscape / Visual Barriers
Enhance and refresh all landscaping (including but not limited to; replacement of overgrown trees, shrubs and ground cover).
💬 Replace dead trees - only item needed.
PIP #23TO DO2 - Building InteriorLobby Areas
Replace display boxes with accessories
💬 ?
PARS benchmark · est. $0 · target China @50% = $0
Marriott SKU
PARS vendor
Unit
Qty
Est. line
Display boxes custom
TBD
$0
1
$0
PIP #40REVIEW4 - Recreation FacilitiesSwimming Pool
Remove planters and plants
PIP #48IN PROGRESS7 - GuestroomsGuestrooms
Replace thresholds (entry and connector)
PIP #91UNKNOWN14 - Fire Protection and Life SafetySprinkler
Provide the most recent annual sprinkler inspection documentation. for the property showing that the sprinkler system has been inspected, tested, and approved. Any major deficiencies noted on the report must be corrected and follow-up documentation attesting to the deficiency corrections must be included
📧 Ningbo (email only) 3
PIP #8REVIEW2 - Building InteriorLobby Areas
Replace sheer drapery
💬 May not be needed - Good condition
PIP #10IN PROGRESS2 - Building InteriorLobby Areas
Replace window treatments
💬 Good conditon
PIP #70IN PROGRESS7 - GuestroomsCorridors and Stairwells
Replace window treatments
Completed per ClickUp (9)
#53 Replace window treatments - blackout (Completed per ClickUp)
#54 Replace decorative drapery (Completed per ClickUp)
#56 Remove coffee table (Completed per ClickUp)
#57 Remove end table (round) (Completed per ClickUp)
#59 Replace desk lamp & bulb (Completed per ClickUp)
#60 Replace floor lamp & bulb (Completed per ClickUp)
#66 Replace shower curtain (Completed per ClickUp)
#67 Paint ceiling as needed (Completed per ClickUp)
#69 Replace base (Completed per ClickUp)
Confirmed purchased (owner override, 8)
#9 Replace vinyl wallcovering, to include accent vinyl (Vinyl wallcovering purchased)
#28 Replace vinyl wallcovering, to include accent vinyl (Vinyl wallcovering purchased)
#78 Replace any damaged or stained acoustical ceiling tiles and/or grid (Ceiling tiles purchased)
#85 Replace any damaged or stained acoustical ceiling tiles and/or grid (Ceiling tiles purchased)
Locked / buy locally (11)
#7 Replace carpet and padding (Shaw/Royal Thai PARS)
#19 Remove S-Canvas and replace with Brand approved art selection (Brand artwork)
#22 Replace artwork (PI Fine Art (most))
#36 Replace wall-mounted LED flat panel TV For free-weight area (TV handled outside this trip)
#46 Accessible Guestrooms: Provide Marriott Standard Accessible Bed (Serta/Sealy PARS)
#49 Replace carpet, pad, and base (Shaw/Royal Thai PARS)
#50 Provide or replace West Elm items (Sofa, Accent Pillow, Ottoman, Tray, Lighting (Floor and Desk Lamp), Task Chair) (West Elm)
#58 Replace nightstand lamps (West Elm (brand mandate))
#61 Replace artwork (PI Fine Art (most))
#71 Replace carpet and padding (Shaw/Royal Thai PARS)
#74 Remove artwork (in lieu of mirror) (PI Fine Art (most))
Labor / paperwork (24)
#1 Franchisee/owner must complete the scheduled renovation as required in the Franchise Agreement in the event the hotel is not sold twelve (12) months from the preliminary PIP issue date.
#2 As required in the Franchise Agreement, the ADA Certification (see Attachment A) must be completed and submitted to Marriott by the Property Improvement Plan (PIP) completion date.
#15 Remove captain's table and outlets
#17 Provide Quick Print outlet and wire management
#20 Provide floor electrical
#21 Replace wall electrical
#25 Paint Metal Doors
#26 Paint Door Frames
#27 Paint Millwork Trim
#38 Resurface/paint pool deck
#43 Paint Door Frames
#44 Paint Door Trim
#55 Touch-up and repair casegoods
#63 Paint walls
#73 Remove FF&E
#76 Paint Door Frames
#77 Paint Doors
#80 Paint Walls
#81 Paint Door Frames
#82 Paint Door Trim
#87 The FLS portion of this PIP was created via desktop based on: a successful and accepted opening by Marriott Fire Protection and Life safety in 2015
#88 The items noted below must be completed 180 days of agreement execution, regardless of the current status of compliance with local codes or previous franchisee guidelines. The fire protection and life safety systems must be inspected, tested, or otherwise approved by Marriott Fire Protection & Life Safety for PIP completion.
#89 Provide the most recent annual fire alarm inspection documentation for the property showing that the fire alarm system has been inspected, tested, and approvd within 6 months of the agreement execution. Any major deficiencies noted on the report must be corrected and follow-up documentation attesting to the deficiency corrections must be included.
#90 Provide documentation that the fire alarm system is monitored by a 3rd party central station that receives signals transmitted from the fire panel